Friday, June 26, 2009

Day 54: Lots of Installations

My husband went out to the house today, then back again this evening. He took the pictures with his phone, so the ones in poorly lit parts of the house are kind of blurry. You can still click on them to enlarge.


Utility Room, shelves installed

Powder Room, mirror, toilet and sink installed

Kitchen (tile being installed)
Microwave mounted
Dining, tiled, with upstairs closet doors leaning on wall
Girls' Bathroom, mirror, sink and toilet installed

Master Walk-In Closet, racks installed, but missing shelves


Master Bathroom, counter top, sink and mirror installed

He came back in the evening. They've done our landscaping,
laid out the grass, and put up fence posts.
The day the front steps were laid, they also did the back side walk and poured the driveway.